Installing Starter Shingle Roll
Control line and nail them down, four nails per shingle. Once it is pressed into place, you're ready to begin shingle installation.
Available in handy individual rolls;
Installing starter shingle roll. Shingle installation begins with starter shingles that are installed along the eave and rake edges. Special methods of fastening are required — six nails per shingle. Asphalt shingles shall have the minimum number for fasteners required by the manufacturer.
Position and roll out the roofing carefully because it is not easy to reposition, then press it into the cement. Compatible with all owens corning® shingles Begin your shingle installation by laying a row of starter shingles along the.
Installs under roofing at the edges. Shingle starter will adhere to the deck and shingle as weather warms. Nail only its top edge (the part that is bare of mineral coating).
With the starter shingles laid along the very edge of the roof, run a set of starter shingles along the sides of the roof as well, making sure that those rows come down and overlap the starter shingles you laid at the bottom. Not less than four fasteners per strip shingle or two fasteners per individual tab. Nail placement, when required to obtain max wind warranty for roofing shingles, are installed 1” (25.4 mm) above the sealant strip and spaced every 6” (152.4 mm) along the eave.
Simply apply a single course of starter shingle roll along a clean, dry and smooth eave line or rake edge after removing the release sheet. Starter shingle roll to assure full adhesion to the underlayment. Install in temperatures at or above 40°f.
Quickstart peel & stick starter roll is designed for fast and easy installation eliminating cutting and nailing of starter strips on the roof. Minimum slope for installation is 2 per foot. If applying shingle starter below 40º f, it may.
Simply apply a single course of starter shingle roll along a clean, dry and smooth eave line, after removing the release sheet. Once it is pressed into. Saves time, labor and material costs.
• apply in dry weather at recommended temperatures of 40º f, or higher. The granulated surface provides excellent foot traction to prevent falls and potential injury. Lower edge of the roofline and nailing them down using roofing nails.
Starter is used with 3 tab shingles, the installer must ensure that nails in the starter are not exposed between the cut outs of the overlaying shingle. See fig.1 2.rake application:install drip edge first,then apply starter shingle roll with sealant strip closest to the outer edge of roof.remove the release backer and press or roll starter shingle roll to assure full adhesion to the underlayment. Be necessary to nail the product in place.
Installation • roof deck or the surface shingle starter will be applied to must be clean and dry. Protects from leaks caused by ice dams, melting snow and blowing rain Apply asphalt shingles… as directed by the.
Apply the starter shingle roll directly onto the weatherlock™ underlayment or a layer of felt. The main reason for a starter course is to fill the gaps between the keys on the shingles. Application is a snap too.
• only apply as much shingle starter as will be covered by shingles in 60. Tom melillo, residential project manager, roof services: Requires no special tools, hardware or training;
Apply the starter shingle roll directly onto the weatherlock®underlayment or a layer of felt. See fig.2 3.if nailing is. Apply shingles once starter shingle roll is installed.
High wind (110 mph or higher): Without the starter course, water would run through the gaps in the. 8 pack = carton of 8 rolls & 216 pack = pallet of 27 cartons › see more product details
Quickstart ® peel & stick starter roll is designed for fast and easy installation. Once the material is up on the roof, they can move on to the starter course. Simply apply a single course of starter shingle roll along a clean, dry and smooth eave line or rake edge, after removing the release sheet.
Quickstart® peel & stick starter roll so that it overlaps the eave edge starter course by at least 3 (76 mm). 7.2 width starter shingle course. Remove the release film from the back of the roll and firmly press or roll into place along the rake edge (fig.
0 Response to "Installing Starter Shingle Roll"
Post a Comment